How Long Does It Take to Build a New Home in Warren County?
Ask the builder for the schedule, then plan for it to slip
When someone tells me they're building in Warren County, my first question is "What date did the builder give you?" My second one is "What's your plan if it's late?" I'm John Meier with Westplex Real Estate in Warrenton, and I've watched a lot of new homes go up around here in 30 years.
Every build is different. The size of the house, the lot, the builder's crew and the weather all change the calendar. So instead of guessing at a number of months, here's how a build moves, so you can ask your builder the right questions.
Before anyone digs
The clock starts long before the first truck shows up. You pick the lot and the builder, settle the floor plan, and choose your finishes. Then come the permits.
- Inside a town like Warrenton or Wright City, the city handles building permits.
- Out in the county, you'll work with Warren County, and a lot with no city sewer or water adds steps for a well and septic.
Ask the builder who pulls the permits and how long that office has been taking lately. If you're building on raw land, read do I need a survey when buying acreage before you buy the lot.
One tip saves more time than any other: make your choices before construction starts. Changes after the walls go up almost always push the date back.
The stages of the build
Most homes go up in the same order. Ask your builder to put a target date next to each stage.
- Site work and foundation. Clearing, grading, digging and pouring. Rock, soil and a wet spring can all slow this down.
- Framing and roof. The house takes its shape. Rain stops this work more than any other stage.
- Dried in. Windows, doors, roofing and siding. Once the shell is closed, weather matters a lot less.
- Rough-ins and drywall. Electric, plumbing and heating and cooling go in, get inspected, and then the walls are closed up.
- Finishes. Cabinets, counters, flooring, paint, fixtures and appliances. Lots of deliveries, so one late order can hold up the rest.
- Final inspection and walkthrough. You walk the house, make a list of anything to fix, and the builder finishes it up.
What slows a build down
- Weather. Long stretches of rain, a hard freeze or summer storms.
- Busy trades. When every builder needs the same plumber or roofer, everyone waits.
- Back-ordered materials. Windows, cabinets and appliances are the usual ones.
- Changes. Moving a wall or swapping a finish after it's ordered.
- Inspections. A failed inspection means a fix and a second visit.
Drive by the site every week or two. You'll know where things stand before the next phone call.
When a delay touches your loan
A late build doesn't only push your move-in date. It can affect your loan too, because your approval and your rate are set up around a timeline. If the house isn't ready when that timeline runs out, your lender may need fresh paperwork, and the rate you were counting on may change.
Here's the move. Talk to your lender before you lock anything in. Tell them the builder's date, ask what happens if it slips, and ask what it would cost to handle a delay. Then call your lender the same day you hear about a new delay, not the week you're supposed to move.
Plan your move around the build
If you're selling a house to move into the new one, timing is the hard part. Line up a place to land in case the build runs long, and think about storage too. My post on how to outgrow your Warrenton home without two house payments walks through the timing, and move-up buyers covers selling one home and buying the next.
If you're still deciding between building and buying a home that's already done, start with buying a home or see how I help buyers.
Let's map out your timeline
A new build is exciting. It's a lot smoother when your builder, your lender and your move are all working off the same calendar.
Call me at (636) 242-5365 or send me a message, and we'll lay out your dates together. There's no hurry. It's a big decision.